Salt Lake County officials shared a master planning document for the music hall, which included key findings from a community outreach process.Specifically, they outlined the need for overall acoustic improvements, expanding the backstage and lobby spaces, modernizing technology in the venue, and reconfiguring the outdoor plaza.Performer and performance spaceImplementing these upgrades were presented in two options that totaled between an estimated $199 and $219 million.
Neither option took into account a 10% cost increase that would be applied for upgrades to existing buildings on earthquake damage prevention. They also did not provide a timeline for when these upgrades would be complete; however, the report stated construction would be done simultaneously to minimize disruption to the symphony.
In the event that simultaneous construction was not possible, it was proposed that it be done in three stages, starting with building system upgrades.After the master planning document was released on May 14, Salt Lake County Mayor Jenny Wilson releasedI appreciate the extensive amount of input regarding the future of Abravanel Hall as a sports, entertainment, culture, and convention district is envisioned in downtown Salt Lake City.
Salt Lake County is the owner and operator of Abravanel Hall. As Mayor of Salt Lake County, I am working diligently on a reimagined downtown, and a district design that allows Abravanel Hall to remain in its present form and value the feedback from the community.
Upgrades Salt Lake City Revitalization 200 Million NHL Franchise Smith Entertainment Group Delta Center
United States Latest News, United States Headlines
Similar News:You can also read news stories similar to this one that we have collected from other news sources.
Source: sltrib - 🏆 316. / 61 Read more »
Source: sltrib - 🏆 316. / 61 Read more »
Source: KSLcom - 🏆 549. / 51 Read more »
Source: sltrib - 🏆 316. / 61 Read more »
Source: KSLcom - 🏆 549. / 51 Read more »
Source: KUTV2News - 🏆 281. / 63 Read more »