NASA Artemis 1 fueling test springs another leak that's deemed 'manageable'

  • 📰 FoxBusiness
  • ⏱ Reading Time:
  • 24 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 13%
  • Publisher: 53%

United States Headlines News

United States Latest News,United States Headlines

A critical fueling test of the NASA Artemis 1 moon rocket hit a slight snag after another hydrogen leak. However, agency engineers said it was 'manageable.'

hit another snag on Wednesday morning after a leak like the ones that had delayed previous launch attempts.

"Teams warmed up the quick disconnect umbilical line and the leak then maxed out at 3.4%, which is within the acceptable range to continue," the team said. "The pre-pressurization test will bring the core stage liquid hydrogen tank up to the pressure level itwhile engineers calibrate the settings for conditioning the engines at a higher flow rate, as will be done during the terminal count on launch day," NASA said in a blog post.

 

Thank you for your comment. Your comment will be published after being reviewed.
Please try again later.
We have summarized this news so that you can read it quickly. If you are interested in the news, you can read the full text here. Read more:

 /  🏆 458. in US

United States Latest News, United States Headlines

Similar News:You can also read news stories similar to this one that we have collected from other news sources.

NASA on Track for Artemis I Cryogenic Demonstration Test on WednesdayNASA remains on schedule for an Artemis I cryogenic demonstration test on Wednesday, September 21. In the days since the previous launch attempt, engineering teams have analyzed the seals that were replaced on an interface for the liquid hydrogen fuel line between the Space Launch System (SLS) rocke
Source: SciTechDaily1 - 🏆 84. / 68 Read more »

Key Milestones for Today’s NASA Artemis I Demonstration TestAs the countdown continued on Tuesday toward the cryogenic demonstration test, NASA teams conducted final closeouts at the pad and performed other preparations for the test. Work will continue through the night, and all non-essential personnel will leave Launch Pad 39B by 3:40 a.m. EDT (12:40 a.m. P
Source: SciTechDaily1 - 🏆 84. / 68 Read more »

Leak reoccurs in NASA Artemis I moon rocketNASA discovered a leak in its Artemis I moon rocket on Wednesday during a cryogenic tanking test in Florida.
Source: abc15 - 🏆 263. / 63 Read more »

NASA Fuels Moon Rocket in Artemis I Test But Is Hit Again With Pesky LeaksThere was no immediate decision on whether NASA would try for a liftoff Tuesday given the sporadic nature of the hydrogen leaks, which have bedeviled the launch team for months. Probably easier if they just faked it in a Hollywood basement. It worked in 1969, so why not again 🤷
Source: NBCDFW - 🏆 288. / 63 Read more »

NASA loads Artemis I rocket with fuel in major troubleshooting testThere were a few leaks along the way but not too many Fill 'er up!
Source: verge - 🏆 94. / 67 Read more »

Artemis I moon rocket fueling test complete after NASA engineers overcome hydrogen leakDuring the test, NASA attempted a 'kinder and gentler' approach using lower pressure to fill the 322-foot-tall SLS rocket with thousands of gallons of cryogenic fuel.
Source: FOX26Houston - 🏆 448. / 53 Read more »