Factory floor work on readying the Astrobotic Griffin Mission One lunar lander that will carry to the moon NASA's VIPER robot.Despite the failure of the first U.S. commercial lunar lander to ever operate in space, Astrobotic Technology is pressing forward on its next moon mission, still on the calendar for launch before year's end.is now on view at the Pittsburgh-based private firm can be watched from the adjoining Moonshot Museum.
Astrobotic's Griffin lunar lander will deploy NASA's VIPER at Mons Mouton, a flat-topped mountain adjacent to the western rim of the Nobile Crater.But the pathway to the moon for Astrobotic has been a rough, rocky road. The loss of the approximately $100 million"These missions are very difficult to start with," Thornton told Space.com."We're doing it at a fraction of what it normally costs to get these missions done.
In the final days of the trouble-plagued mission, a decision was made to direct Peregrine Mission One to make a destructive,NASA's ice-hunting VIPER moon rover getting ready to slither to the launch pad
United States Latest News, United States Headlines
Similar News:You can also read news stories similar to this one that we have collected from other news sources.
Source: PoPville - 🏆 435. / 53 Read more »
Source: SPACEdotcom - 🏆 92. / 67 Read more »
Source: VanityFair - 🏆 391. / 55 Read more »
Source: RobbReport - 🏆 309. / 63 Read more »
Source: RollingStone - 🏆 483. / 51 Read more »
Source: latimes - 🏆 11. / 82 Read more »