An executive order meant to hasten the rollout of offshore wind projects in the country and a smart green grid plan aimed at ensuring the seamless integration of additional renewable energy into the grid are the energy “game changers” of the Marcos administration.
“Because of these new developments in new technology, what we need is facilitation of permitting. So, one of the things the President did was sign EO 21 for OSW such that there’s a whole government approach to permitting,” Guevara said. “As part of the Philippine Energy Plan, DOE is formulating the Smart and Green Grid Plan, a strategic plan for our transmission system that incorporates accelerated RE development in the grid from 2025 to 2035.
The DOE, she added, is closely working with NGCP, which holds the sole and exclusive concession and franchise for operating the Philippines’ transmission network, on this.
Source: News Formal (newsformal.com)
Philippines Latest News, Philippines Headlines
Similar News:You can also read news stories similar to this one that we have collected from other news sources.
Source: MlaStandard - 🏆 20. / 55 Read more »
Source: MlaStandard - 🏆 20. / 55 Read more »
Source: rapplerdotcom - 🏆 4. / 86 Read more »
Source: TheManilaTimes - 🏆 2. / 92 Read more »
Source: MlaStandard - 🏆 20. / 55 Read more »
Source: ABSCBNNews - 🏆 5. / 83 Read more »