Kazaure-Dutse-Daura Rail Project To Be Completed By 2026- Minister

  • 📰 channelstv
  • ⏱ Reading Time:
  • 59 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 27%
  • Publisher: 63%

Nigeria Headlines News

The Latest News from Nigeria and Around the World

The Kazaure-Daura, Dutse-Kazaure and Daura railway projects will be completed by 2026, according to the Minister of Transportation, Mu’azu Sambo.

“So what I did was to approach the National Universities Commission to appoint a mentor university for us so that we will be able to start admission against 2023/2024 academic year. The NUC appointed ABU to mentor the Federal University of Transportation Daura.“So far, after the accreditation, the university admitted over 500 students enlisted in 14 different disciplines. We have started the admission and we outsourced lecturers on a visiting basis.

“I am impressed with the project. The contractor has done well, however, there are a lot of challenges like water, electricity and we are on top of the situation to fix the university to the national grid and we find a lasting solution to the water problem”, the minister disclosed.Sambo assured of the Federal Government’s commitment to link the narrow gate from Lagos to Kano dry port, as part of measures to save roads and reduce the menace of road traffic accidents.

Meanwhile, two of the pioneer students of the university, Bello Musawa and Ahmed Aminu, have appealed to the Federal Government, to as a matter of urgency, fix the electricity and water challenges facing the university.

 

Thank you for your comment. Your comment will be published after being reviewed.
Please try again later.
We have summarized this news so that you can read it quickly. If you are interested in the news, you can read the full text here. Read more:

 /  🏆 7. in NG

Nigeria Latest News, Nigeria Headlines

Similar News:You can also read news stories similar to this one that we have collected from other news sources.

Kano-Daura rail project to be completed by 2025The Federal Government says that the Kano-Daura rail project will be completed by 2025. The Minister of Transportation, Said Alkali, gave the assurance on Friday in Abuja during an interview with NAN. According to the Minister, the project is one of the priority projects of the ministry to be actualised at the stipulated time.
Source: DailyPostNGR - 🏆 11. / 59 Read more »

Kano-Daura rail project to be completed by 2025The Nation Newspaper Kano-Daura rail project to be completed by 2025 – FG
Source: TheNationNews - 🏆 6. / 69 Read more »

Emir of Dutse flags off vaccination of 1.5 million childrenThe Emir of Dutse, Hameem Nuhu Sanusi, has flagged off a special round of polio vaccine campaign targeted at over 1.5 million children in Jigawa State. The ceremony took place at his palace after he personally administered the vaccine on some children and assured the community that it was safe and effective.
Source: DailyPostNGR - 🏆 11. / 59 Read more »

PHOTOS: Jigawa gov, Buratai, Magu, others, grace dinner in honour of new Sardaunan DutseThe dinner was held at the Banquet Hall of the Government House, Dutse, Jigawa State, Capital.
Source: PremiumTimesng - 🏆 3. / 78 Read more »

Buhari, Shettima, Ameachi in Jigawa as Nasiru Danu is turbaned as new Sardaunan DutseThe emir tasked the new title holder to uphold the integrity of Dutse Emirate in his new capacity as Sardaunan Dutse and Kingmaker.
Source: PremiumTimesng - 🏆 3. / 78 Read more »

FG to link University of Transportation Daura to national gridThe Nation Newspaper FG to link University of Transportation Daura to national grid
Source: TheNationNews - 🏆 6. / 69 Read more »